|
From:
The MRP
II Standard System Workbook
Copyright: Landvater and Gray
Call Chris Gray at 603 778-9211 for help in
evaluating your software against these functions.
SERVICES
S&OP
Resources
Books
On-site
S&OP Education
S&OP
Instructor's Manual
S&OP
Software
S&OP
Consulting
Education
Courses
On-site Workshops/Classes
Education Materials
S&OP Instructor's Manual
MPS Instructor's Manual
Consulting and Research
Consulting
Class A Certification
Performance Assessment
Software Evaluation and Selection
MRP II Standard System
Definition
Software Supplier Directory (140K)
Software
eSOP - S&OP Software
Books
Recommended
Books
The Right Choice by Chris Gray
The
MRP II Standard System by Chris Gray and Darryl Landvater
Sales
and Operations Planning Handbook by Don Rice and John Civerolo
ARTICLES
Master
It (Master Scheduling and Lean Production)
Staying
in Business with e-Business
Time
to Get Serious About e-Commerce
Does
Your Supply Chain Measure Up?
The
Party's Over - The Real Aftermath of Y2K
Back
to Basics
Software
and Simplicity
Turning
Education Expense into an Investment that Pays Off!
ERP
Software: Valuable Tips for Selection and Implementation
Coca-Cola:
"Always" Class A
AFFILIATES
Associates
and Related Companies
Worldwide
Excellence Partners
Partners for Excellence
Graham Barton (New Zealand)
Bill
Belt Excellence (French language)
Who We Are
Chris Gray Biography
Books by Chris Gray
|
Home
Education
Consulting Software Books
Articles Affiliates
Gray Research
Basic Architecture
Summary
- Net change versus regeneration.
- Bucketless (plan by date) versus
bucketed planning logic.
- A shop calendar that distinguishes work
days from non-work days.
- A planning horizon long enough for
effective material, capacity, and financial planning.
Detailed
checklist
Sales and Operations Planning
Summary
- The ability to state future sales and
operations plans by product family.
- A sales and operations planning report
for product families that shows the key planning information as well
as comparisons of plans to actual activity.
- A method to convert the sales and
operations plans from the primary unit of measure to units of measure
meaningful to finance, manufacturing, engineering, sales and
marketing, etc.
- A method to compare and evaluate the
sales and operations plans against the business plan.
- Rough cut capacity requirements
planning.
Detailed
checklist
Master Production Scheduling
Summary
- A master production schedule order which
is a statement of production and which can be used to state the master
production schedule.
- Specialized transactions and logic to
reduce the time required to create and maintain the master production
schedule. A rate based master schedule generator is helpful in a high
volume, repetitive environment.
- A master production schedule report that
shows demands against the master schedule, the master production
schedule itself, the projected available balance and the available to
promise.
- The means to total the master production
schedule for comparison back to the sales and operations plan.
- Exception messages to indicate to the
master scheduler which master schedule items require attention.
- The means to assist the master scheduler
in master scheduling a product at two levels.
- The tools to assist the master scheduler
in managing changes to the master production schedule. These tools
include:
Rough cut capacity planning.
A lead time picture.
Detailed
checklist
Demand Management
Summary
-
A forecasting system that includes the
following:
Several simple forecasting techniques
and a method for evaluating them.
A way to take seasonal factors into
account.
A way to break down and allocate
forecasts of families of items by warehouse, configuration, package
size, etc.
A way to review and approve (or
override) the forecast before updating the system.
-
An order entry system that includes
transactions to add, change, and delete customer orders and that
supports order confirmation, picking, and shipping.
-
A method or methods for promising
customer deliveries based on availability, not standard lead time
policies.
-
A way to handle order entry for products
made from options.
-
A method for comparing existing customer
orders to the forecast for the purpose of identifying demands that may
be abnormal.
-
A way to indicate demands that have been
identified as abnormal.
-
Forecast consumption logic and a
calculation of total demand that includes the following functions:
A method for handling customer orders
that do not match the forecast week-by-week, but which may be a good
approximation of the demand forecast over longer periods.
A method for handling past due forecasts
and past due customer orders.
A method for handling abnormal demands,
dependent demands, distribution requirements, and interplant orders.
-
A way to introduce spare parts demands
into the Material Requirements Planning system.
Detailed
checklist
The Netting and Exception Checking Logic of
MRP
Summary
- Netting calculation using the
rescheduling assumption.
- Logic for phantoms, transients, and
self-consumed assemblies.
- Rescheduling exception messages.
- Additional exception messages.
Detailed
checklist
Order Planning and Explosion
Summary
- Determine the due date of the planned
order.
- Determine the quantity of the planned
order.
Order policies of lot-for-lot and
fixed are required.
Period order quantity of one week is
required in a bucketless system.
- Through the process of explosion reflect
the planned orders in the component gross requirements.
Detailed
checklist
Entry into the Planning Sequence for
Processing
Summary
- Enter all parts that require processing
into the planning sequence.
Regeneration: Parts with
requirements, orders, or allocations.
Net Change: As the result of
transactions that have the potential to create an exception message
or a change to a planned order.
- Through the use of low level codes, or
some other device, do the netting and order planning on a part only
after all gross requirements have been posted to it.
Detailed
checklist
Firm Planned Orders
Summary
- Provide the ability to override the
standard lead time or standard order quantity rules for a part.
Detailed
checklist
Pegging
Summary
- Provide a detailed listing of gross
requirements showing the date, quantity, and parent item number.
- Provide a detailed listing of
allocations showing the date, quantity, and parent item number.
Detailed
checklist
Human Engineering
Summary
- A display of the time phased
information, exception messages, and supporting details to any summary
information.
- Presentation of the information in a
logical manner and in a convenient number of reports or displays.
Detailed
checklist
Bill of Material Subsystem
Summary
- The ability to store and maintain
parent-component relationships.
- A reporting function that includes the
following:
Single level bills of material.
Multi-level bills of material.
Single level where-used listings.
- Low level coding or the equivalent.
- Net change system: The logic to update
the gross requirements when the bills of material are changed.
- The ability to assist in the
implementation of engineering changes.
Engineering effectivity dates.
Bill of material deviations that are
tied to an order.
- The ability to assist in scheduling
disassembly, sorting, and chemical processes with byproducts.
Detailed
checklist
Inventory Transaction Subsystem
Summary
- Handle the issue and receipt
transactions
- Support a multiple inventory location
system.
- Provide a way to reduce the inventory
transaction volumes caused by a repetitive production process or
smaller, more frequent lot sizes.
- Support cycle counting.
Provide a method for sampling the
inventory records.
Support a two step cycle counting
process.
- Provide a clear and easy-to-use audit
trail for investigating inventory errors.
Detailed
checklist
Scheduled Receipt Subsystem
Summary
- The ability to add, delete, and change
scheduled receipts.
- Allocation logic and a component
availability check.
- The ability to add, change, and delete
final assembly schedule orders.
- A status reporting function.
Detailed
checklist
Firm Planned Order Subsystem
Summary
- Provide the means to add, change, and
delete firm planned orders.
- Update the component gross requirements
whenever a firm planned order is added, changed, or deleted, or as
part of the material requirements planning logic to reflect the firm
planned order status.
Detailed
checklist
Routing Subsystem
Summary
- The ability to store and maintain
item-work center relationships.
- A reporting function that includes the
following:
Routing by item.
Work center where-used listing.
- Net change capacity planning system: The
logic to update the capacity requirements when the routings are
changed.
Detailed
checklist
Scheduling and Dispatching
Summary
- Maintain an open shop order file for
each manufacturing scheduled receipt.
- Provide back scheduling logic using
normal scheduling rules to determine operation schedule dates for
items handled through a dispatch list. This includes the ability to
override the scheduling rules.
- Provide a daily dispatch list showing
the shop schedule for items handled through a dispatch list.
- Support scheduling through a demand pull
or KANBAN mechanism.
- Provide a simple status report of all
orders.
Detailed
checklist
Capacity Requirements Planning
Summary
- Generate capacity requirements from both
planned and released orders.
- A reporting function that includes the
following:
A display of the total capacity
requirements for each work center.
A display of the capacity
requirements details for each work center.
A display by manufacturing family to
assist in grouping items with similar set-ups.
- Allow the orders to follow or deviate
from the normal routing.
Detailed
checklist
Input Output Control
Summary
- Compare the planned and actual input and
planned and actual output for a work center.
Detailed
checklist
Supplier Scheduling and Related Purchasing
Activities
Summary
- Provide a vendor scheduling tool.
- Provide a tool for vendor negotiations.
- Maintain purchase order controls.
Schedule dates that include inspection.
Outside processing operations.
Detailed
checklist
Distribution Resource Planning
Summary
- Provide a method for developing
distribution or interplant requirements and for posting them to the
master production schedule at the supplying facility.
- Maintain distribution information on
scheduled receipts that are in transit to branch warehouses or branch
plants.
- Use the distribution requirements
planning or interplant orders to generate and display the
transportation plan.
- Provide a method for handling a fixed
shipping schedule.
Detailed
checklist
Tool Planning and Control
Summary
- Maintain tooling information:
Tooling descriptive information.
Tooling required by operation.
Tooling on-hand balance.
Tooling scheduled receipts.
Show tooling on shop paperwork.
- Provide an MRP display for tooling.
- Provide a capacity planning report
including exceptions to show any conflicts in the use of tooling.
Detailed
checklist
Financial Planning Interfaces
Summary
- Provide a tool for calculating current
inventory value and for projecting inventory value.
- Provide a tool for planning cash flow.
- Provide a tool for allocating fixed
overhead expense.
Detailed
checklist
Simulation
Summary
- Provide a method for simulating the
effects of changes to the production plan and master production
schedule on:
The rough cut capacity plan.
The material requirements plan.
The capacity requirements plan.
The financial plan.
Detailed
checklist
Performance Measurements
Summary
- Provide a measurement of inventory
record accuracy.
- Provide a measurement of master
production schedule performance.
- Provide a measurement of manufacturing
performance.
- Provide a measurement of vendor
performance.
Detailed
checklist
|
|